Built for a fast architecture workflow
- Rise / level difference input in mm
- Slope percentage input
- Required horizontal ramp run
- Equivalent 1:n slope ratio
- Slope angle in degrees
Calculate the horizontal run required for a ramp from a level difference and target slope percentage. The tool also converts the same slope into a 1:n ratio and angle in degrees.
A 600 mm rise at 8.33% slope needs approximately 7.20 m of horizontal run. The same slope is about 1:12 and roughly 4.76°.
Enter the vertical rise or level difference in millimetres.
Enter the intended slope as a percentage.
Calculate to get the required horizontal run.
Use the displayed ratio and angle as cross-checks during early layout work.
No. The calculated run is the geometric ramp run from the entered rise and slope. Required landings, clear widths and code provisions must be checked separately.
A 1:12 slope means one unit of vertical rise for every 12 units of horizontal run.
Use it as a calculation aid only. Accessibility limits and landing requirements depend on the applicable code and project conditions.
Your existing ArchiTeamTools workspace opens with this tool selected.